Floating Anchor

← Back to Jane Street Interview Questions

Question

A sailing school expects fees from overseas students, so its Australian-dollar revenue \(R\) is uncertain. It can buy a whole number \(n\ge0\) of currency hedges. The profit from one hedge, in thousands of Australian dollars, is \(H\). For the period in question, the school's risk model gives
\[ \operatorname{Var}(R)=144,\qquad \operatorname{Var}(H)=10,\qquad \operatorname{Cov}(R,H)=-28, \]
with \(R\) also measured in thousands of dollars. The profit on \(n\) contracts is \(nH\); there are no independent hedge copies.

Each contract requires $4,000 of margin. The school has $12,000 in unrestricted cash but must leave at least $4,000 untouched for boat repairs. Margin is tied up until the fees arrive; it is not itself an expense in the variance calculation.

What integer number of contracts minimises \(\operatorname{Var}(R+nH)\) subject to the cash reserve? Give the resulting variance, the unconstrained continuous optimum, and why simply rounding that optimum is not a valid procedure here.

Hint 1

First turn the required reserve into a maximum possible integer number of hedge contracts.

Expand \(\operatorname{Var}(R+nH)\) using the covariance, then evaluate the resulting quadratic at each feasible whole-number position.

Check your answer

© 2026 EverythingQuant. All Rights Reserved.