Question
Two repairs start at noon, each with its own technician working at a constant rate. Their solo completion times are independent: A's is uniform on \([0,3]\) hours, and B's has distribution
\[
P(T_B\le t)=\frac{t^2}{16},\qquad 0\le t\le4.
\]
These are the times the repairs would take without help.
If A finishes while B is still running, A's technician immediately joins B. From then on, B's remaining work is completed at twice its original rate, with no setup time. You are told only that A finished first, between 1 and 3 hours after noon; its exact finish time is not reported.
Under this assistance rule, what is the probability that B is finished by 3 p.m., given the reported information?
Get hint
Hint 1
If A finishes at hour \(a\) and B would finish alone at hour \(b>a\), how much time would B's remaining work take at its original rate, and how much at double that rate?
Check your answer
Solution
Let \(a\) and \(b\) denote the solo completion times of A and B. Before A finishes, B works at its original constant rate. If \(a<b\), the remaining work at time \(a\) would take another \(b-a\) hours at that rate. Doubling the rate halves only this remaining time, so B's actual completion time is
\[
c=a+\frac{b-a}{2}=\frac{a+b}{2}.
\]
It is not \(b/2\), because B did not receive help from noon.
The first-finish report corresponds to
\[
E=\{1\le a\le3,\ b>a\}.
\]
Assistance starts only after A finishes, so it does not change whether A finished first. The independent solo-time densities are \(f_A(a)=1/3\) on \([0,3]\) and \(f_B(b)=b/8\) on \([0,4]\). Thus
\[
P(E)=\int_1^3\frac13\left(1-\frac{a^2}{16}\right)da
=\frac1{48}\int_1^3(16-a^2)\,da
=\frac{35}{72}.
\]
Finishing by hour 3 requires \((a+b)/2\le3\), or \(b\le6-a\). B's solo time also cannot exceed 4. For \(1\le a\le2\), the bound \(6-a\ge4\) means every allowed \(b>a\) finishes in time. For \(2<a\le3\), the relevant upper bound is \(6-a\). Therefore
\[
\begin{aligned}
P(E,c\le3)
&=\frac1{48}\int_1^2(16-a^2)\,da
+\frac1{48}\int_2^3\big((6-a)^2-a^2\big)\,da\\
&=\frac{41}{144}+\frac18
=\frac{59}{144}.
\end{aligned}
\]
Dividing by the report probability gives
\[
P(c\le3\mid E)
=\frac{59/144}{35/72}=\boxed{\frac{59}{70}}.
\]
The boundary at \(a=2\) has a direct interpretation: even B's maximum solo time of 4 then becomes an assisted finish at hour 3. When \(a>2\), the largest B solo times miss the deadline. The failure mass is \(35/72-59/144=11/144\), so the conditional success and failure probabilities are \(59/70\) and \(11/70\). Exact ties and endpoint equalities have probability zero. Independence applies to the solo times; the assisted finish \(c\) depends on both of them.
Assumptions
Solo time \(T_A\) is uniform on \([0,3]\) hours and solo time \(T_B\) has CDF \(\frac{t^{2}}{16}\) on \([0,4]\), with CDF zero below 0 and one above 4. The solo times are independent.
Both repairs begin at noon and initially proceed at their own constant solo work rates.
When A finishes first, help starts immediately and exactly doubles B's rate for all remaining work. There is no setup delay or restart.
The information is exactly A first with \(T_A\) in \([1,3]\), without an exact timestamp or any later report about B.
The deadline is three hours after noon. Solo times and actual assisted completion times are distinct quantities; continuous laws make ties irrelevant.
Final Answer
\(\boxed{59/70\approx84.29\%}\). If A's solo time is \(a\) and B's is \(b>a\), assistance makes B's actual finish time \((a+b)/2\), so the favourable region is \(1\le a\le3\) and \(a<b\le\min(4,6-a)\).